|
Originally Posted by Yoda
|
|
I have long agreed that Pace should reference 6-P-0. Also, in 12-5-3, Item #12 (Impact Fix) should read 7-8, not 7-3. And Item #10 in 12-5-2 should probably be Lag Loading, not Loading Action (else the Reference # should be changed).
|
Thanks for the confirmation!
Moving on...
Does 12-5-2/3 include all the components before it (e.g. components in 12-5-3 includes all those in 12-5-2 and 12-5-1)?
The 1-L reference for 12-5-1 #15 (Pressure Point #3) is 1-L-7 and 1-L-12.
1-L-7: The Lever Assembly is driven by exerting pressure against it.
So for obvious reasons, I'm thinking this reference is for Hitters only. Hmmm...
1-L-12: Ball Speed is dependent on both before Impact and after Impact Clubhead Speed.
I'm thinking...PP#3 is usually assigned for sensing Clubhead Lag. And the prestressed shaft that comes with Clubhead Lag helps resist Impact Deceleration. Hmmm...